To say that this project was a challenge would be a major understatement , but the Team was able to take the original concept design and totally transform this space .
Trying to get accurately cut materials such as Cemento and 1200 sq stone floor iles to fit in a structure which had a will of its own , plus Brexit and Covid material and labour shortages .
As the project manager / CA on this job my grey hair is now largely white !
We are really pleased with the lighting and comfort cooling in the spaces and the way that it was integrated into the spaces , all as designed by Parker Wilson ,