Size: 2500 sq m / 22,500 sq ft
Services: M&E design and services coordination.
Project: Central Sterile Services Departments situated in Guys and St Thomas hospitals. The design works included mechanical ventilation, process water, steam services and electrical installation in process and administration areas. These involved a self-controlled lighting network, door interlock and extract system interlink with MDU Fog room disinfection gas and washers’ specialist hot exhaust. The enabling works at Guys included the rerouting of services within the original basement kitchen and the provision of a new patient/hospitality kitchen.
Site Location: Guy’s Hospital, London and St Thomas’ Hospital, London